St Mary’s School

Prior to Nomow’s arrival in 2011 the play equipment for this primary school was installed in an enormous sand pit. The sand had become contaminated over time with rubbish, dirt and all number of things no-one wants their children running around in, so the school brought in Nomow to put it right! Our installation crews worked over a period of weeks to stabilise the existing sand base by adding cement, creating a level surface suitable for the artificial grass to be installed on top- saving the school a phenomenal £25,0000- the estimated cost of having the entire sand base dug out and removed from site! – See more at: http://www.nomow.co.uk/case-studies/?album=1&gallery=11#sthash.cK56DsSK.dpuf