Case Study: Castleview School

Completed May 2015

Reception area (189m2) and nursery area (188m2) – Total 384m2 Play 365

It’s peak season here at Nomow and we’ve been super busy, transforming school playgrounds up and down the country!

Our job is to get school surfaces summer-ready so that kids can get out & about and run around in the sunshine!

One of our most recent projects saw us complete a full installation of Nomow artificial grass at a school in Slough.

Castleview School came to us looking for a complete transformation of a dull, grey, concrete play-area, which was no longer serving the school or the children.

After having exciting new play equipment installed by Nomow collaborators Hags SMP, we covered the school’s entire nursery and reception play area with soft and durable range Nomow Play 365.

Play 365 was the perfect choice for Castleview’s requirements, as the area was being used regularly by the youngest children in the school.

Play 365 is specifically designed with play in mind, and makes an exceptionally soft surface for children to enjoy. Its unrivalled resilience and great bounce-back makes this range ideal for areas being heavily used by children.

It is also of course covered by Nomow’s 10 Year Installation Guarantee, which means school staff can rest assured their play area will remain beautiful, fun for the children, and maintenance free all year round.

Nomow also worked closely with the school to provide a completely bespoke design for the playground, incorporating Rainbow Range zig-zags and spots around the new play equipment.

Take a look at our amazing ‘Before and After’ shots and tweet us @nomowltd1 to let us know your thoughts – we think it looks great!

If your school is battling with an unsuitable or hazardous area of play, get in touch to find out how Nomow can transform these unsightly problem areas into beautiful, fun and safe play spaces!

school-beforeschool-after

 

Menu